Courtesy of Caltrans:
A project to resurface State Route 129 from west of Old School Road to east of the US 101/State Route 129 Interchange, just north of San Juan Bautista, which began Monday, July 6, will also include overnight weekend work on Friday, July 10 and Saturday, July 11 from 8 pm to 5 am from the Pajaro River Bridge to the interchange of US 101 and State Route 129.
Construction will continue next week as follows:
Motorists will encounter daytime ramp and lane closures Monday through Thursday from 7 am to 7 pm and on Fridays from 8 am until 2 pm.
Motorists will encounter overnight ramp and lane closures Sunday night through Friday morning from 8 pm to 6 am.
One-way reversing traffic control will occur during the daytime hours. Details will be announced when the dates/times are certain. Traffic delays should not to exceed 15 minutes.
This project will result in an improved roadway surface and a smooth ride for the public. The contractor for this $1.2 million project is Cal Valley Construction Inc. of Fresno, CA.
Caltrans reminds motorists to move over and slow down when driving through highway work zones.
For traffic updates on other state highways in San Benito County, motorists may call Caltrans District 5 Public Affairs at (805) 549-3318 or visit our District 5 website at:
https://dot.ca.gov/caltrans-near-me/district-5Â A link to the location of this project is at: https://www.google.com/maps/@36.8976943,-121.5745422,14z